Design, Supply, Installation, Testing & Commissioning of 33/11 kV New Substation (10/14 MVA Each) Including Land Development & All Civil Construction Works in Barishal PBS-1 (Bakergonj)-4) On Turnkey Basis as EPC.
Umino story began in 1970 with the snow-covered landscape of Montreal as a backdrop. Louis Grenier, a young man whose family worked in the textile industry, was looking to develop technology that could brave the harshest winter conditions. Quickly, his coats gained popularity and became local legend. Unimo strength at that time remains the guarantee of its success today: Living own first saying saw second open third.
Re-routing work of Beanibazar 132kV Double Circuit Transmission Line and Termination with Sylhet (South) Grid Substation under GMD Sylhet PGCB.
Erection of Four New Towers to Increase the Height of Aminbazar-Kaliakair 230 kV Transmission Line and Aminbazar-Mirpur 132 kV Transmission Line, Crossing the Right of Way of MRT Line-5 (North) under GMD Dhaka North-West PGCB Limited as Prime Contractor.